3d杀和尾

Loviisa power plant

3d杀和尾 for 40 years, fortum has been running its fully owned nuclear power plant in loviisa, finland. the power plant consists of two plant units, loviisa 1 and loviisa 2.

Loviisa nuclear power plant

Our fully owned nuclear power plant

3d杀和尾loviisa 1 was commissioned in 1977 and loviisa 2 in 1980. operating licenses are valid until 2027 (lo1) and 2030 (lo2). instead of conventional fuel (e.g. coal, natural gas or peat), a nuclear power plant uses uranium as a source of energy.

loviisa power plant has two vver pressurised water reactors (pwr) with capacities of 507 mw net (lo1) and 502 mw net (lo2). the plant units generate a combined eight terawatt-hours (twh) of electricity annually for the national grid. that covers about 13 per cent of finland's electricity production. the amount of electricity generated at the loviisa power plant is almost equivalent to the total electricity consumption of the cities of helsinki, espoo and vantaa.

in terms of availability, loviisa ranks among the best in the world for pressurised water reactor power plants.

Contacts

Fortum Power and Heat Oy, Loviisa power plant
Postal address: P.O. Box 23
Visiting address: Atomitie 700
FI-07901 Loviisa, Finland

Read more information about Loviisa power plant

浙江省12选5走势和值一定牛 三地和值尾振幅带连线专业版 3d杀和尾十大杀尾专家汇总 太湖钓叟hyh8 幸运飞艇冠军5码怎么计算